Hidden fields
Libros Libros
" In building up the filtering-bed, provision is first made for the ready collection of the water by constructing upon the floor of the basin drains or channel-ways of stone or brick laid dry; then follows a layer of broken stone, the fragments being three... "
Report [for the Year Ending Dec. 31]. - Página 30
1875
Vista completa - Acerca de este libro

Annual Report of the Secretary of War, Volumen2

United States. War Department - 1880 - 760 páginas
...up the filtering beds, provision is first made for the ready collection of the water by constructing upon the floor of the basin drains or channel-ways...screened so as to be of uniform size ; a layer of coarser being followed by one or more layers of fine material; upon the gravel rests sand likewise...
Vista completa - Acerca de este libro

Report of the Chief of Engineers U.S. Army, Parte3

United States. Army. Corps of Engineers - 1880 - 762 páginas
...np the filtering beds, provision is first made for the ready collection of the water by constructing upon the floor of the basin drains or channel-ways...diameter. This is succeeded by gravel screened so us to be of uniform size ; a layer of coarser being followed by one or more layers of line material;...
Vista completa - Acerca de este libro




  1. Mi biblioteca
  2. Ayuda
  3. Búsqueda avanzada de libros
  4. Descargar EPUB
  5. Descargar PDF