Annual Report, Volumen12

Portada
1913
 

Otras ediciones - Ver todas

Términos y frases comunes

Pasajes populares

Página 239 - ... are situated a description thereof sufficiently accurate for identification, with a statement of the purpose for which the same were taken, signed by the water commissioners of the town. SECTION 4. The town shall pay all damages sustained by Payment of any person or corporation by the taking of any land, rights 'images...
Página 36 - Total receipts, . $109,164.97 $874,649 81 (c) Assets. The following is an abstract of the assets of the Water Works, a complete schedule of which is kept on file in the office of the Board : — Office furniture, fixtures and supplies; engineering and scientific instruments and supplies; police supplies; horses, vehicles, field machinery, etc.; machinery, tools and other appliances and supplies; real estate connected with works not completed; completed works, including real estate and buildings connected...
Página 241 - ... under authority of chapter four hundred and eighty-eight of the acts of the year eighteen hundred and ninety-five...
Página 67 - Chief Engineer has charge of the design and construction of all new works, and of the maintenance and operation of all the works controlled by the Metropolitan District Commission for removing sewage from the twenty-six municipalities which comprise the Metropolitan Sewerage Districts.
Página 147 - The latter consists of a specially designed engine of the vertical cross-compound type, having between the cylinders a centrifugal pump rotating on a horizontal axis. Contract capacity of the two original pumps : 4,500,000 gallons each, with 13foot lift.
Página 1 - To the Honorable the Senate and House of Representatives of the Commonwealth of Massachusetts in General Court assembled.
Página 2 - The following have also acted under the direction of the Chief Engineer: Elliot RB Allardice, Superintendent of the Wachusett Department; Charles E. Haberstroh, Superintendent of the Sudbury and Cochituate Works and of the portion of the Weston Aqueduct above the Weston Reservoir; Samuel E. Killam, Superintendent in charge of the Weston Reservoir and the remaining portion of the Weston Aqueduct, and of all reservoirs and pipe lines within the Metropolitan District; and Arthur E. O'Neil, Superintendent...
Página 4 - Board and the secretary, and of the auditing and conveyancing departments, and the main engineering offices of both Water Works and Sewerage Works, are located in the buildings numbered 1 and 3 Ashburton Place, at the corner of Somerset Street, in Boston.
Página 242 - Upon the expiration of his term of office a member shall continue to serve until his successor is appointed and shall have qualified.
Página 147 - River, costing from $4.375 to $4.59 per gross ton. Table of Approximate Quantities, Lifts and Duties at the Alewife Brook Pumping Station of the North Metropolitan System. MONTHS. Total Pumpage (Gallons). Average per Day (Gallons). Minimum Day (Gallons). Maximum Day (Gallons). Average Lift (Feet). Average Duty (ft.-lbs.

Información bibliográfica