Annual Report, Volumen9 |
Otras ediciones - Ver todas
Términos y frases comunes
15 inch Alewife Brook American cement mortar Approximate cost Assistant Engineer Avenue Average depth Average width Board bottom of underdrain Brickwork Cambridge Charles River Charlestown Commonwealth concrete Contractors cost of masonry Dedham Deer Island depth of trench Dorchester East Boston excavation per linear excavation to bottom feet from beginning feet sand foot cubic yards foot of trench gallons Greatest depth Hyde Park Inches Sewer July June labor Length of masonry linear foot cubic loam Location masonry completed masonry per linear Mattapan Medford Melrose metropolitan sewer Middlesex South District Mother Brook Mystic River Neponset River NEPONSET VALLEY SYSTEM Number Open cut pay rolls peat pipe Portland cement mortar private land Pumping Station recorded with Middlesex refilling below masonry River Street rolls for month sand and gravel sewage Sewerage Shirley Gut siphon Somerville South District Deeds supplies for month tarred paper trench excavation trench feet underdrain feet West Roxbury
Pasajes populares
Página xxxv - Milton side of the river, about 10 feet from the southerly end of the Central Avenue bridge. It is proposed to support the sewer upon a portion of the bridge structure where it crosses the river. The third plan shows a sewer about 195 feet in length, extending from the Neponset valley intercepting sewer at Mattapan Square to and beneath the Neponset River to a point in Milton about 30 feet south of the southerly bank of the river. The place of crossing the river, as indicated by the plan, is about...
Página 78 - East Boston Pumping Station. At this station are four submerged centrifugal pumps, with impeller wheels 8.25 feet in diameter, driven by triple-expansion engines of the Reynolds-Corliss type. Contract capacity of 1 pump: 100,000,000 gallons with 19-foot lift. Contract capacity of 3 pumps: 45,000,000 gallons each, with 19-foot lift. Average duty for the year: 66,900,000 foot pounds.
Página xii - Squire, and acknowledged the foregoing instrument to be the free act and deed of John P. Squire & Co. Before me (Signed) WARD C. MANSFIELD, Justice of the Peace.
Página xxxviii - MASSACHUSETTS, BOSToN, Oct. 23, 1896. At the meeting of this Board, held Oct. 17, 1896, the accompanying resolutions, which are self-explanatory, were unanimously passed, and in accordance therewith I transmit the enclosed copy. For the Board, Very sincerely and respectfully yours, (Signed) EDWARD...
Página 9 - Valley Area and the Number of Public Connections made with the System in Each City and Town. A detailed statement relating to construction and maintenance during the year follows : — SECTION 50 (WAKEFIELD BRANCH), MELROSE AND WAKEFIELD. Location. — From a point at the junction of Lake Avenue and Tremont Street extending to the junction of Tremont and Melrose streets; thence to the junction of Melrose and Belmont streets (passing under the stone arch bridge of the Boston & Maine Railroad) ; thence...
Página 56 - Labor and teaming $283 25 Cement, pipe, brick, lumber, etc., 216 11 Miscellaneous expenditures, 20 58 $519 94 NEPONSET RIVER CROSSING, CENTRAL AVENUE. Location. — Starting from a man-hole on the Metropolitan Sewer, Section 12, at Central Avenue, extending southerly to the Neponset River; thence across the river on the girders of the bridge across the Neponset River and under the tracks of the Old Colony system of the New York, New Haven & Hartford Railroad...
Página 72 - Pumping Station of the North Metropolitan System. MONTHS. Total Pumpage ( Gallons). Average per Day (Gallons). Minimum Day (Gallons). Maximum Day (Gallons). Average Lift (Feet). Average Duty (ft.-lbs.
Página viii - Whenever, within one year from the passage of this act, said town shall by a majority vote of the legal voters of said town present and voting thereon at a legal meeting called for that purpose...
Página 46 - At the lower end of section, about 100 feet north-westerly from the Dedham branch of the New York, New Haven & Hartford Railroad, and about 1,500 feet northerly from Mother Brook, working up grade of sewer. Point where work was in progress Sept. 30, 1897, . About 2,000 feet from the beginning of section and about 800 feet south of the southerly entrance to Caledonian Grove. About 270 feet from beginning of...
Página xiv - ... stations on this line. CONNECTIONS WITH THE METROPOLITAN SEWER ON THIS SYSTEM. At this date (Oct. 1, 1897) one hundred and one connections have been authorized with the metropolitan sewer on this system. These connections have been made during the period covered by the years 1894, 1895, 1896 and 1897, the year in each case ending with October 1, and for the public benefit we publish below a complete list of the connections authorized on this system to date, said list being published by towns...